PROJECT NAME: Reinneck Road Improvements
OWNER: Freeburg Road District
LOCATION: Freeburg Township, St. Clair County, Illinois
CONSTRUCTION COST: $175,000
YEAR COMPLETED: 2007
PROJECT DESCRIPTION: The Freeburg Road District and St. Clair County employed our firm to prepare preliminary and final plans, specifications, and estimates for reconstruction of 2,040 L.F. of Reinneck Road.  The project included the horizontal and vertical realignment of the roadway to eliminate two right-angle horizontal curves and improve the vertical sight distance.  A Section 404 Permit from the U.S. Army Corps of Engineers was obtained in order to replace a box culvert carrying Reinneck Road over a branch of Hazel Creek.  An NPDES Permit from the Illinois Environmental Protection Agency was required for erosion control measures during construction.  The rural roadway project was subject to review and approval by the St. Clair County Department of Roads and Bridges.  Our firm was also retained to perform the construction services including construction staking, materials testing, construction observation and contract administration.



Transportation Areas of Service:
Roads & Streets
Traffic Engineering
Planning / Funding Applications
Recreational Facilities
Construction Inspection


© Copyright 2006 Rhutasel and Associates, Inc. All rights reserved.