PROJECT NAME: St. Clair Township WWTF Emergency Generator Project
OWNER: St. Clair Township
LOCATION: Belleville, St. Clair Township, Illinois
CONSTRUCTION COST: $150,000
YEAR COMPLETED: 2006
PROJECT DESCRIPTION: St. Clair Township completed the addition of a new 750 KW stand-by generator at their 1.5 MGD wastewater treatment plant. The diesel powered generator, manufactured by Cummings Power, allows the full plant to continuously operate all treatment processes throughout a power outage. The power is automatically transferred from utility to the generator in the case of a power outage. Rhutasel and Associates, Inc. provided the design, bidding, and construction observation for the project.



Environmental Areas of Service:
Water Supply, Treatment, & Storage
Water Transmission, Distribution, & Pumping
Wastewater Collection & Pumping
Wastewater Treatment